Weekly Meeting 2 ~ Monday, 5-18-09
From Drexel Smart House
Project/Modular Living Environment/Meeting/2009
Contents |
Meeting Information
Title: Weekly Meeting 2
Date: Monday, May 18, 2009
Time: 4:30pm
Location: Dr. Wen's Office
Attendees:
Dr. Jin Wen
Dr. Eugenia Ellis
Adrian Lu
Jared Langevin
Sam Steffes
Minutes Prepared By: Adrian Lu
Agenda
N/A
Notes, Decisions, Issues
2.1 ~ Pro/E Report Review
Put design failures/design iterations in the Appendix
Goal of Report: What/Why/How we tested, What are the results
2.2 ~ DIRTT Trip
Goals of trip: Investigate wall materials they use - Jared
Investigate mechanical connections (ie. wall panels to frame)
Anything else?
2.3 ~ Cross-beam Design Review
Design needs to be finalized.
Is the Ikea, twisting locking mechanism feasible?
2.4 ~ Proof of Concept Clarification
Proof of concept calls for REFERRING to ASTM E695 for impact testing. It does not require us to follow the standard strictly.
Don't need to prove anything acoustic-wise for proof of concept
Generally, there are no specific ASTM standards we need to prove (which means we don't have to test the criteria), however, it would be best if we tested the criteria we have outlined in the testing report to bring credibility to our research efforts.
2.5 ~ Prototype
~ $8000 budgeted to build it
Physical prototype due by end of June.
Action Items
2.1 ~ DONE - Meet w/ Prash to review the Pro/E Report (Sam & Adrian)
DONE - Set up meeting with Prash, Sam, and Adrian (Adrian)
DONE - Outline what report will be about. Due Friday 5.22 (Adrian)
2.3 ~ Get a physical sample of "Ikea idea" for next meeting 5.26.09
DONE - Review Cross-beam design with Jameson